Author: Guan, X.
Paper Title Page
TUA03 The Compact Pulsed Hadron Source Status* 112
 
  • X. Guan
    TUB, Beijing, People's Republic of China
 
  Abstract The Compact Pulsed Hadron Source (CPHS) at the Tsinghua University in Beijing, China has been reported in this paper. CPHS consists of a proton linac, a neutron target station, and a small-angle neutron scattering instrument, a neutron imaging/radiology station, and a proton irradiation station. The proton linac accelerator part is composed of a ECR ion source. LEBT section, a RFQ accelerator, a DTL linac and a HEBT. A 3 meters long of RFQ machine can accelerate the proton to 3MeV. No MEBT will be requirement in this project. The Drift Tube Linac with permanent magnets focusing lens will accept the proton beam direct from RFQ. A 4.3 meters length of DTL will accelerate the beam up to 13MeV. The HEBT section will transport the proton beam from output of DTL to the center of MTR. Up to now, the IS/LEBT and the RFQ heve ready. The first phase of the CPHS construction is scheduled to complete 3MeV proton beam on the target in the middle of 2012.
*Work supported by the “985 Project” of the Ministry of Education of China,
**[email protected]
 
slides icon Slides TUA03 [3.998 MB]